Repair and Refurbishment

Expertise

Steelwork strengthening, blasting and painting

Steelwork strengthening

We have unrivaled technical capability in the execution of steel-work strengthening works on bridges, self-delivered utilsing our own in-house welding qualifications and NDT procedures in accordance with our NHSS 20, BS EN ISO 3834-2 and BS EN 1090-2 accreditation’s. We follow our own company NDT procedures and have a fully qualified inspection workforce in both CSWIP and PCN certifications, qualified to carry out Visual and NDT inspections on major bridges and structures.

Steelwork Repairs
Bearing replacement on the Forth Road Bridge

The quality of steel-work strengthening on major bridges is paramount to ensure the design life of the structure is maintained. Their location is often in highly corrosive marine environments and subject to fatigue loading, therefore the quality of the inspections and welding repair works must be of a high standard. Integrated with our delivery teams, our structural engineers, metallurgists and welding engineers provide technical support and guidance on achieving quality levels to our clients.

Coupled with the utilisation of our bespoke access solutions, painting capability and temporary works execution, we are able to provide a comprehensive self-delivery offering to our clients for all steel-work strengthening and welding requirements.

Steelwork Repairs
Steelwork repairs at Erskine Bridge

Our team engages with key stakeholders throughout the project cycle to consider access, plant, site constraints and environmental impacts associated with steel-work strengthening activities, for every project we undertake.

Blasting and painting

Spencer Group’s capabilities include self-delivery of onsite blasting and painting works, working on bespoke structures in challenging environments including working at height, over waterways and within live railway environments.

Blasting and Painting
Encapsulation at Boothferry Bridge

As a sector scheme 19a contractor, our team are experienced in self-delivery of blasting, painting and associated inspection works on highway structures utilising our in-house procedures to control the quality of the painting works in strict accordance with the specification of highway works series 5000.

The quality of the preparation and painting on bridge works is paramount to ensure the lifespan of the paint system is realised. Their location is often in highly corrosive marine environments, therefore the quality of the painting must be of a high standard and applied strictly in accordance with the paint manufacturers data sheets to provide guarantees on the life of the coating.

Blasting and Painting
Blasting and painting at Erskine Bridge

Coupled with the utilisation of our bespoke access solutions, steel-work and welding capabilities, we are able to provide a comprehensive self-delivery offering to our clients for all blasting and painting applications on bridges and structures.

Our team engages with key stakeholders throughout the project cycle to consider access, plant, site constraints and environmental impacts associated with blasting and painting activities, for every project we undertake.

Address


Spencer Group, One Humber Quays, Wellington Street West, Hull HU1 2BN

Email


think@thespencergroup.co.uk

Phone


01482 766340